
Pipes on the beach for the SANDAG sand project in Imperial Beach.
SANDAG has stared a local sand replenishment projects. WiLDCOAST supported this project as an alternative to a long list of horrific projects that deposited toxic sediment, rocks, garbage, metal and glass on our beaches under the direction of the U.S. Army Corps of Engineers. Hopefully this project will be a bit better.
Here is a summery of the history of local sand projects:
The history of Imperial Beach is rife with a parade of badly executed “beach replenishment” projects that have failed to actually do much to protect our coastline. The problem of our receding shoreline is the result of the combination of sea level rise, the construction of the Rodriguez Dam and the armoring of our coast.
Here is a brief history of the mostly unsuccessful and fatally flawed sand projects carried out by federal agencies at the urging of the city of Imperial Beach. Only one agency, SANDAG, has been able to carry out a successful beach project—primarily due to its commitment to using clean, large-grain sand for its projects.
1976-77: The most toxic areas of South San Diego Bay are dredged and the spoils are dumped on Imperial Beach, killing benthic life (e.g., sand crabs) for more than a decade. Local surfers still tell stories about the skin rashes they received from contact with the filthy sediment.
1977-84: The Army Corps of Engineers attempts to build a mile-long breakwater in Imperial Beach. The fledgling Surfrider Foundation and local surfer Jim Knox stop the project at the last minute. The breakwater would have forever destroyed surfing and wave action in most of Imperial Beach.
2001: SANDAG carries out a project with clean sand, which helps to create great sandbars for surfing and clearly increases the size of our beach.
2004: Army Corps dredges area near the Bay Bridge. Barges then dump toxic sediment in the surf zone including thousands of rocks and pieces of garbage, dangerous rebar and metal onto the beach and in the surf zone. Surfers call the dump area “Toxics.” One child is almost impaled by a piece of rebar that is hidden in the surf zone. The city initially denies that the garbage and rocks are from the project. No measurable benefit to beach.
2007: Army Corps permits the dredging of a toxic hot spot in San Diego Bay’s Shelter Island. Dredge spoils are dumped with no notice to Imperial Beach residents. Barge is initially turned away by Imperial Beach lifeguards. The barge subsequently works in the middle of the night to avoid public scrutiny. No measurable benefit to beach.
2009: Starting in 2000, Army Corps and the city of Imperial Beach plan a $75 million long-term project involving dredging an area near the border sewage outfall pipe that was used as a World War I gunnery and bombing area. WiLDCOAST, Imperial Beach surfers, the Surfrider Foundation, Senator Tom Coburn and the Obama White House kill the project that the city of Imperial Beach spent more than $250,000 lobbying for.
2010: SANDAG once again proposes “best practices” sand project to be carried out in 2012 involving clean large grain sand. The agency works extensively with local surfers and stakeholders to plan the project.